Assessment of Time and Costs of Two Formwork Methodologies in the Philippines using BIM Simulation

Jason Maximino C. Ongpeng

Abstract


In the Philippine construction industry, choices of formwork methodology is critical to contractors or client/project managers. Cost and time are the parameters commonly considered to address which method is recommended for a project. In this study, simulation using BIM was made from input parameters taken from actual project observations and data collection from five projects. Two methods were considered: method A (traditional forms) and method B (steel decks). The output parameters after the BIM simulation were processed cost and time. A statistical t-test was conducted for both process costs and time durations to differentiate between the two methods. It was found out that the process costs for overall, columns, and beams of method A were not statistically different from method B, while the slab process cost was significantly different. This indicated that only slab process cost was relatively expensive for method B. For the duration, both the columns and beams were not statistically different, while overall and slabs’ duration was significantly different. It showed that overall duration and slab process duration is relatively lower for method B. This paper showed that BIM simulation could help managers in their decision on choosing the construction methodology to balance cost and time of their project.


Keywords


building information modelling (BIM); formworks; steel deck

Full Text:

PDF

References


A. Sandhyavitri, I. Talha, M. Fauzi, S. Sutikno,"Managing Construction Risks of the Toll Road Project in Indonesia," International Journal on Advanced Science, Engineering and Information Technology, vol. 7, no. 5, 2017.

C.K. Baxi, Formwork - a concrete quality tool, 36th Conference on Our World in Concrete & Structures, Singapore Concrete Institute 2011.

Z. Ibrahim, S. B. Mohamed, M. Minhat, A. S. Mohamed, M. R. Musanih, Z. Abd Rahman,"Reason Maintenance in Product Modelling via Open Source CAD System," International Journal on Advanced Science, Engineering and Information Technology, vol. 6, no. 6, pp. 990-996, 2016.

Y. Shin, T. Kim, H. Cho, & K. Kang, A formwork method selection model based on boosted decision trees in tall building construction, Automation in Construction, 23, 47-54, 2012.

J. Das, Build Smart. Building and Construction Authority Singapore 2011.

F. Opitz, R. Windisch, R.J. Scherer, Integration of document- and model- based building information for project management support. Procedia Engineering, 85, 403-411, 2014.

T. Gerrish, K. Ruikar, M. Cook, M. Johnson, M. Philip, BIM application to building energy performance visualization and management: Challenges and potential, Energy and Buildings 144, 218-228, 2017.

M.K. Kim, Q. Wang, J.W. Park, J.C.P. Cheng, H. Sohn, C-C. Chang, Automated dimensional quality assurance of full-scale precast concrete elements using laser scanning and BIM, Automation in Construction 72, 102-114, 2016.

K. Kim, Y. Cho, S. Zhang, Integrating work sequences and temporary structures into safety planning: Automated scaffolding-related hazard identification and prevention in BIM, Automation in Construction 70, 128-142, 2016.

S. Song, J. Yang, N. Kim, Development of a BIM-based structural framework optimization and simulation system for building construction, Computers in Industry 63, 895-912, 2012.

X. Li, J. Xu, Q. Zhang, Research on construction schedule management based on BIM Technology, Procedia Engineering 174, 657-667, 2017.

K. Sigalov, M. Konig, Recognition of process patterns for BIM-based construction schedules, Advanced Engineering Informatics, 2017.

B.Y. Yoo, H.J. Yoon, Y.J. Kim, K.M. Lee, Stepwise application of BIM-based parametric modeling to tapered slip-form system, Procedia Engineering 145, 112-119, 2016.

M. Kassem, B. Succar, Macro BIM adoption: Comparative market analysis, Automation in Construction, 2017.

E. Alreshidi, M. Mourshed, Y. Rezqui, Factors of effective BIM governance, Journal of Building Engineering 10, 89-101, 2017.

D. Cao, H. Li, G. Wang, T. Huang, Identifying and contextualizing the motivations for BIM implementation in construction projects: An empirical study in China, Project Management 35, 658-669, 2017.

H. Wei, S. Zheng, L. Zhao, R. Huang, BIM-based method calculation of auxiliary materials required in housing construction, Automation in Construction 78, 62-82, 2017.

F.H. Abanda, B. Kamsu-Foguem, J.H.M. Tah, BIM – new rules of measurement ontology for construction cost estimation, Engineering Science and Technology, an International Journal 20, 443-459, 2017.

Y. Su, Construction Crew Productivity Monitoring Supported by Location Awareness Technologies Ph.D., dissertation, University of Illinois,




DOI: http://dx.doi.org/10.18517/ijaseit.8.3.5838

Refbacks

  • There are currently no refbacks.



Published by INSIGHT - Indonesian Society for Knowledge and Human Development